GUE-Steubenville Ave. Signal Operations, Cambridge, Ohio

The project included 12 signals within the City of Cambridge. The project was in conjunction with the installation of a closed loop system. Collected data, developed optimal signal timing, worked with the vendor to properly implement the timing plan, performed artery drive-throughs to evaluate the timing plans, and wrote a report that quantified the improved system performance.